• University Square 1

    University Square

    One coat sealcoat application, restriping. 132,415 sq ft done in 3 phases.

    San Luis Obispo
  • Prime Time 1

    Prime Time

    Remove 64,000 sq ft of existing asphalt and pour 6” concrete reinforced with #4 rebar.

    Somis
  • Mission Oaks HOA 2

    Mission Oaks HOA

    Sealcoat and restripe entire community. 191,000 sq ft done in 4 moves.

    Solvang
  • Marina Village Shopping Center 1

    Marina Village Shopping Center

    Sealcoat and restriping. 2 coats completed in June 2019.

    Ventura
  • Lake Sherwood Community 1

    Lake Sherwood Community

    Full depth and sectional repair of asphalt pavement and subgrade, asphaltic overlays, concrete repairs, crack sealing, applications of sealcoat, type 2 road slurry, and restriping of pavement.

    Westlake
  • GPM Koehler Winery 1

    Koehler Winery

    2” Fabric Asphalt Overlay (30,000 sq ft)

    Los Olivos